Seatrade Lombok Strait

Project Description

Detyens dry docked the Lombok Strait in a fully loaded condition.  This was an emergency repair to her shaft seal. Detyens has also dry docked the Santa Lucia, and Luzon Strait.

Project Details

  • Date May 19, 2014
  • Tags Containers
Back to Top